R. L. Jones, LP, filed a construction notice of intent for 13.66 acres of grading and stockpiling at Botanical Farms near Altwein Lane and Elmons Road in Guadalupe County.
The Nov. 18 filing names the site as Botanical Farms — Land Development and places it at the east intersection of Altwein Lane and Elmons Road, with no street address. It estimates a project period from Nov. 1, 2026, through Nov. 30, 2028. Those dates are the operator’s estimates, not proof that work has begun.
Where and when
The places and times below come from the official pages linked with each one.
- Site
Botanical Farms land-development site
East Intersection of Altwein Ln & Elmons Rd, New Braunfels
No physical street address is listed in the filing.
From the source record
What is the total number of acres that the construction project or site will disturb under the control of the primary operator?Texas Commission on Environmental Quality construction notice of intent ↗
Residents near Altwein Lane and Elmons Road now have a filed notice identifying construction activity and potential stormwater runoff toward the Guadalupe River.
The operator lists grading and stockpiling as the activity, says concrete truck washout will occur on site, and identifies the Guadalupe River below the Comal River as the first water body to receive potential runoff. The filing also identifies Guadalupe County as the storm-sewer-system operator and certifies that a stormwater pollution prevention plan has been developed for implementation before construction.
The filing is a notice of intent; it does not itself establish permit approval. Residents can inspect the site description, runoff information and application reference number 985933 in the county-posted notice. A later TCEQ status record and the site’s stormwater plan would establish what authorization and controls apply.
