Seguin residents could see future trails, shared-use paths and multimodal corridors guided by a new city map if council adopts the proposed active transportation network Dec. 1.
Map from the record

The council is scheduled to consider the resolution at 5:30 p.m. Dec. 1 in Council Chambers, with a public and virtual meeting option. The proposal concerns the plan for future facilities; it does not itself establish that a trail or path has been built.
From the record

A separate network for walking and cycling
The planning report says the Transportation Mobility Master Plan is intended to replace the older Master Thoroughfare and Master Trails plans. The report says council approved the roadway alignment portion in October; the active transportation network remains proposed for Dec. 1. The upcoming choice would add another layer to that planning framework.
The proposed network distinguishes multimodal corridors, shared-use paths and off-street trails. Exhibit A supplies the official proposed active transportation map and legend. Its retained text identifies those facility types, existing trails and boundaries; the route lines themselves should be checked on the map before assigning a particular street to a category.
The report describes Geronimo Creek Trail as a connection to the Great Springs Project. It also distinguishes shared-use paths within road sections from trails away from streets and describes multimodal corridors as places where transit stops may be considered.
