After a closed session Oct. 20, Seguin City Council unanimously adopted a resolution declaring a need for permanent utility, permanent access and temporary construction easements for the 36-inch Geronimo Creek wastewater interceptor project.
The verified account of the public action records a motion by Council Member Keller and a second by Council Member Raya.
From the source record
These are separate proposed easement interests; the figures should not be added as a land-total calculation.
Before the Oct. 20 action, the listed item proposed acquiring three easement interests in part of a 183.7-acre tract in the John Sowell Survey No. 16. The posted agenda identifies the tract by deed Document No. 202199005689 and lists a 0.2840-acre permanent utility easement, a 0.5217-acre permanent ingress and egress easement, and a 0.2872-acre temporary construction easement.
What the easements are for
The listed easements would provide space for wastewater infrastructure and access for its construction, operation and maintenance. The agenda also describes installation, repair, upgrade and removal of multiple water, wastewater and reuse lines and related equipment as purposes of the proposed utility interest. Those descriptions establish the scope sought for the property; they do not describe construction work already underway.
