Seguin’s proposed $100,000 agreement with CEC Corporation would inspect two Power Plant bridges and produce a preliminary engineering report.
The staff memo identifies two bridge-class structures on city property over Mays Creek. It asks City Council to authorize a study before choosing what work, if any, should follow. Staff proposes paying for the agreement with Lake Seguin Hydro-Electric Partners LLC Hydro Plant Lease funds.
From the source record
The proposed scope calls for inspections of both bridges and a preliminary engineering report comparing options.City of Seguin ↗
For Seguin residents, the proposed expense would buy information for a later bridge choice, rather than construction itself.
What the study would buy
The proposed scope calls for visual inspections, documented deficiencies, maintenance recommendations and timelines, and load ratings for both bridges. These are tasks for CEC to perform under the contract; the proposed agreement is not an inspection finding.